330.929.3333

Machine Quote Request

When filling out the Machine Quotation Request Form, please be aware that the options listed may not be available on all machine models. A Union Process representative will contact you to discuss your quote request in detail after receiving the form.



    Contact Information


    () -


    Mill Model



    Materials to be Processed

    Desired Throughput



    Wet or Dry?



    Sensitivity of Material




    Electricals (Indoor Use)



    Electrical Notes

    1. Select your voltage requirements from the drop down list. If yours is not listed, select "Other" and the factory will contact you.


    2. Non-Hazardous

    • Standard Motor: 2 Speed, TEFC, 450% starting torque.

    • Standard Controls: 2 Speed, NEMA 12 enclosure, machine mounted and wired.


    • Variable Speed Motor: Inverter duty, TEFC.

    • Variable Speed Drive: VFD, NEMA 12 enclosure, machine mounted and wired. (some sizes available in NEMA-4X/12 enclosure)


    3. Hazardous

    • Standard Motor: 2 Speed, explosion-proof, 450% starting torque.

    • Standard Controls: 2 Speed, NEMA 7/9 enclosure, explosion-proof, machine mounted and wired.


    • Variable Speed Motor: Inverter duty, explosion-proof.

    • Variable Operator Station: NEMA 7/9 enclosure, explosion-proof, machine mounted.

    • Variable Speed Drive: VFD, NEMA12 enclosure, non-explosion proof. Must be customer mounted in a non-hazardous area. Wiring to machine and operator station by customer.

    Explosion-proof is for Class I, Division 1, Group D, Class II, Division 1, Groups F/G areas. (Other hazardous area classifications are available on request)


    Tank

    Tank Notes

    4. On production size units, The standard tank is stainless steel. AR steel is available as an option. Ceramic, Polyurethane and plastic lined tanks are available for other mills.


    5. Standard jacket is designed for maximum 10 psig. ASME coded vessels for higher pressure are available on request.


    6. Standard agitator arms are made from hardened tool steel or stainless steel. Optional: Can be nickel hard-faced or have tungsten carbide, polyurethane, plastic or ZR02 sleeves.


    Tank Cover


    Pumping System


    Grinding Media


    Modifications or Additional Comments


    Quotation Standards:

    All units quoted F.O.B. Union Process. Machine Quotations are valid for 60 days from date of quote.

    Payment Terms: USA

    Laboratory Units:
    net 30 days

    Production Units:
    40% Down with order
    30% Prior to ship
    30% Net 30 days

    Payment Terms: All Other

    Laboratory Units:
    net 30 days

    Production Units:
    Letter of credit or wire transfer before shipment